A surveyor for a map is one of the first names that appear in the list of specialists needed when building a house. Before the architect begins to draw a project, he must have up-to-date and accurate data about your plot. Where to get them? Precisely from the surveyor, who prepares the so-called map for design purposes. A map for design purposes is an updated version of the situational - altitude map, made by an authorized surveyor for the needs of the construction process. It depicts the boundaries of the plot, neighboring buildings, the armament of the site (utilities), land design, fences, descents, power poles - everything that can affect the location of the house. It is on this map that the architect applies the land development project - an element necessary for applying for a building permit or filing.

The question often arises: do I need to hire a surveyor if I bought a ready-made house project? Yes. Even if you are building from a catalog, a map for design purposes is needed with any adaptation - the architect must place the project on a specific site, according to its actual conditions.

How does cooperation with a surveyor look like? First, you choose a local specialist - preferably one who knows the official realities in a particular district. The surveyor obtains data from the documentation center, makes field measurements and develops a map - both paper and digital. The lead time is usually from a few days to two weeks. Cost? Dependent on the size of the plot and location, but on average falls within the range 800 - 1500 zł net.

What about maps from the internet? Is the map from the geoportal enough for a construction project? No. Such maps do not meet the standards of scale, timeliness and markings required by building law. The Office will only accept a map for design purposes on a scale of 1:500, bearing the signature of an authorized surveyor.

Investors also often ask: Does the map for design purposes have an expiration date? Formally - no, but in practice, many offices expect the document to be current, that is, not older than 3 to 6 months. It is worth remembering this when planning the schedule of cooperation with the architect and the submission of documents.

Imagine the situation: the investor wants to save and gives the architect an old map from the Internet. The designer can not start work - key information is missing, the boundaries are uncertain, the connections are not confirmed. The whole process is delayed, and the savings turn out to be apparent. In the meantime, it would be enough to order one, well-prepared map. A surveyor for a map is not an addition to the project - it is its starting point. Without an up-to-date, professional map, the correct development project will not be created, adaptation will not start, you will not submit documents to the office. If you want to run smoothly, start with a map. And a good surveyor? This is an investment that pays off at the start.